
Proposal · RFP v2.1
20. Proposal requirements
Chrysal Website 2027 · Extended draft · 19 October 2026
RFP-hoofdstuk 20
The proposal in ten parts
The executive summary, strategy, UX, SEO/GEO, technology, migration, team, roadmap, commercial aspects and risks are explicitly brought together.
Our response & approach
Addressing ten proposal components
Below, we explicitly address the ten requested proposal components. The references connect this compact decision summary to the full elaboration in the preceding chapters.
1 Executive summary
We recommend a WordPress content platform that connects Chrysal’s customer questions to knowledge, evidence, solutions and local specialists, with a recognisable brand experience and independent editorial management. Our advice is Core plus Recommended: €22,610 one-off (190 hours). Core alone is €14,756 (124 hours); the five Recommended building blocks add €7,854 (66 hours). Hosting, maintenance and plugins are separate at €240 per month (€2,880 per year). All amounts exclude VAT and remain draft until scope and commissioning are confirmed. AI, e-commerce and integrations are future extensions, not included launch functionality. The detailed arguments and conditions are in chapters 1–3 and 15–17 and in “Proposal & investment”.
2 Strategic response
The website supports the transition to an integrated solutions partner by connecting customer challenges with knowledge, evidence and different types of solutions. The existing flower-care offering remains directly accessible. Growth domains can be set up using the same model. The strategic alignment towards 2035 lies in this extensible foundation and a repeatable decision-making cycle, not in a promise that technology will require no maintenance until 2035. See chapters 1–5 and 9.
3 UX content and brand approach
The six customer journeys determine the information architecture and priority screens. Technical content receives clear document metadata and source references. A responsive design system unites technical authority with human imagery and understandable language. A small editorial team manages pages using components and patterns. See chapters 4–6 and 10.
4 SEO GEO search and AI
Launch includes research, technical SEO, question-driven content structure, search, a measurement foundation and controlled migration. A new generative AI interface is optional. The second brain will, however, be prepared as a managed knowledge source. We measure search performance, user behaviour, qualified enquiries where feedback is available and a repeatable sample of AI mentions. See chapters 7, 8, 11 and 12.
5 CMS and technical recommendation
WordPress with the block editor, managed components and an explicit language and market model offers an appropriate combination of editorial freedom and manageability. Hosting, caching, security, privacy, accessibility and continuity are set up in an integrated manner. Integrations are selected based on business usefulness. Regional commerce receives a documented expansion path. See chapters 9, 10 and 13.
6 Migration and adoption
We inventory what exists, preserve valuable content and URLs where possible and test the entire transition. Training starts before the final content round and is assessed using real tasks. Two weeks of monitoring with SEO/GEO monitoring is included; warranty and support follow on from this. See chapters 12, 14 and 17.
7 Relevant experience and team
Two published Afdeling Online projects illustrate relevant parts of the assignment. We present these as experience with B2B, UX, content, findability and scalable commerce. The sources do not demonstrate an identical global rollout; scope, period and reference contacts will be additionally confirmed before submission.
Moduplus as a relevant example
Moduplus is relevant because one website serves two audiences: professional partners and dealers through a secured login environment, and end users looking for information and inspiration. For Chrysal, this mirrors the desired dealer environment and the combination of B2B customers with consumers as end users. Thermaflex (multi-market B2B with technical products) and Solarge (visual storytelling around a sustainable proposition) are further websites built by Afdeling Online. [5]
Bamboovement as relevant experience
The Bamboovement is relevant because of the combination of brand story, UX, a workable CMS and expandable e-commerce. The published case also describes attention to preserving existing URL value. This aligns with Chrysal’s wish to add commerce functions later while independently managing the website in the meantime. Here too, we link the experience to the approach; we do not claim equivalent international platform complexity. [6]
Explaining the core team and allocation
For Chrysal, we propose a compact core team with specialists at set points. In this draft, Jaap is the intended strategic lead and commissioning party on the agency side; his availability and the other names will be established before the final proposal. The roles and involvement below already make clear who actually bears responsibility. The hours are part of the budget in chapter 16 and are not additional to it.
| Role | Specific involvement | Block one hours | Block two hours |
|---|---|---|---|
| Online strategist | Discovery, strategic session, customer journeys and launch priorities. | 12 | 0 |
| Project manager | Day-to-day coordination, dependencies, planning, budget and decisions. | 4 | 0 |
| Digital designer and UX | Five page designs, block library and optional wireframes and prototype. | 24 | 16 |
| Developers and technical lead | WordPress blocks, content types, languages and markets, search, forms and the launch. | 50 | 0 |
| SEO/GEO specialist | Migration, redirects, monitoring, keyword research and content strategy. | 22 | 34 |
| Analytics and privacy implementation | Analytics, Tag Manager and consent. | 2 | 0 |
| QA and accessibility | Testing, quality control and accessibility check or WCAG 2.2 AA scan. | 4 | 16 |
| Training and adoption | Content entry workshop, documentation and migration templates. | 6 | 0 |
| Total | The same project hours as in “Proposal & investment”, distributed here by role. | 124 | 66 |
Organising continuity through replacement
Continuity is organised with a second technical contact and a substitute for project coordination, plus shared documentation and code. In the event of unavailability, the current handover is used first and Chrysal receives a replacement and scheduling proposal. The final proposal includes names, relevant experience, specific availability and substitutes. This is a supporting document still to be completed, not an already confirmed staffing plan.
8 Roadmap and governance
A phased schedule runs from discovery to design, build, migration, training, UAT and launch. Approval takes place on specific deliverables. Chrysal provides one product owner, subject-matter experts and local owners. A sponsor decides on scope and budget. We safeguard coherence and report weekly on progress and bottlenecks. See chapters 15, 18 and 19.
9 Commercial proposal
Core and Recommended have separate budgets and explicit quantities. Future functions, regional commerce, licences, variable costs, maintenance and support are listed separately. Unknown integrations and content volumes are not a hidden fixed-price commitment. A changed scope requires a decision on price and scheduling in advance. See chapters 16 and 17.
10 Risks and challenges
The biggest risk is that international content and decision-making fall behind the technical build. A second risk is that local variation leads to an unnecessarily large number of versions. We limit this with clear source owners, a central architecture and early content deadlines. We also assess whether desired integrations genuinely add value. The risks below are tracked in the project register.
| Risk or assumption | Potential impact | Measure and owner |
|---|---|---|
| Content volume and translations are greater than estimated. | Additional work and a later launch. | Early inventory; Chrysal content owner confirms volumes and priority before scope approval. |
| Local approval takes too long. | Outdated or incomplete market content. | Appoint local owners and set deadlines; product owner escalates. |
| Too many local design deviations. | Fragmented brand experience and higher management costs. | Assess deviations for business usefulness; central Marketing manages the design rules. |
| An external interface turns out to be more limited than assumed. | Higher integration costs or less functionality. | Technical lead checks documentation and test access during discovery. |
| URLs, documents or language relationships are missed. | Loss of reach and trust. | SEO lead combines multiple inventory sources and tests priority routes. |
| Insufficient evidence for technical or sustainability claims. | Incorrect communication and reputational damage. | Chrysal experts validate the source, context and limits of application before publication. |
| Premature use of AI with incomplete knowledge. | Unreliable answers and additional management. | Knowledge base first, then a bounded pilot with a content owner. |
| A regional webshop turns out to be a full B2B portal. | Fundamentally different scope and costs. | Assess commerce requirements separately; sponsor decides on the business case. |
| Unconfirmed SLA or certification claims. | Contractual expectations that are not demonstrably met. | Agency and suppliers provide evidence and operational confirmation before the proposal. |
Save this page as PDF
The print version is formatted as a document, without buttons or navigation. Choose “Save as PDF” in the print dialog.